top of page
KL&A Logo.png

Search Results

368 results found with an empty search

  • Kiewit Office Building

    Kiewit Office Building Two 5 story office buildings, both steel framed, 250,000 sf and 150,000sf; as well as a stand alone 330,000 sf precast concrete parking structure. Project Type Office Date 2021 Location Lone Tree, Colorado Architect Stantec Architecture Contractor Kiewit Cost $160 Million Project Delivery Type Design/Bid/Build Services Provided Structural Engineering Materials Composite Steel; Precast Concrete

  • Eleven

    This public art piece is located in Canton, Ohio and commemorates the frontier of the NFL. It is composed of carbon and stainless steel as well as dichroic glass. Eleven This public art piece is located in Canton, Ohio and commemorates the frontier of the NFL. It is composed of carbon and stainless steel as well as dichroic glass. Project Type Date Location Artist Fabricator Cost Project Delivery Type Services Provided Materials Sculptures 2014 Denver, Colorado Michael Clapper Undisclosed Undisclosed Design/Bid/Build Structural Engineering Steel

  • Denver Hospice Addition

    Denver Hospice Addition 24,000 sf addition to an existing Inpatient Care Center. Project Type Healthcare Date 2020 Location Denver, Colorado Architect MOA Architecture Contractor Fransen Pittman Construction Cost $6.2 Million Project Delivery Type Design/Bid/Build Services Provided Structural Engineering Materials Composite Steel; Light Gage - Structural; Structural Masonry

  • Genesis Project

    Genesis Project Pre-engineered metal building addition to an existing church. Project Type Religious Date 2020 Location Fort Collins, Colorado Architect Infusion Architects Contractor Brinkman Partners Cost $1.5 Million Project Delivery Type Design/Bid/Build Services Provided Structural Engineering Materials Concrete - Mildly Reinforced

  • Firestone Public Safety Facility

    Firestone Public Safety Facility 27,800 sf single story public safety facility. Project Type Fire Stations Date 2019 Location Firestone, Colorado Architect Roth Sheppard Architects Contractor FCI Constructors Cost $12 Million Project Delivery Type Design/Bid/Build Services Provided Structural Engineering Materials Steel; Architectural Concrete; Light Gage Veneer; Structural Masonry

  • Jackson Center for the Arts

    Jackson Center for the Arts 160,000 sf performing arts complex with auditorium, art and dance studios, administration space, residential units and structured parking. Project Type Museums & Art Centers; Renovation & Retrofit Date 2007 Location Jackson, Wyoming Architect Harry Teague Architects Contractor GE Johnson Cost $35 Million Project Delivery Type Design/Bid/Build Services Provided Structural Engineering Materials Steel

  • Bleeker Duplex

    Bleeker Duplex 6,600 sf residential building with two units. Project Type Single Family Residences Date 2019 Location Aspen, Colorado Architect S2 Architects Contractor Koru Design Cost Undisclosed Project Delivery Type Design/Bid/Build Services Provided Structural Engineering Materials Wood - Stick Frame; Composite Steel

  • Fellowship of the Rockies

    Fellowship of the Rockies 46,700 worship facility including a large sanctuary, classroom space, administrative space and small kitchen. Project Type Religious Date 2018 Location Pueblo, Colorado Architect Hord Coplan Macht Contractor Undisclosed Cost $13 Million Project Delivery Type Design/Bid/Build Services Provided Structural Engineering Materials Steel

  • Meow Wolf

    Meow Wolf 95,000 sf, 5-story building with complex geometry. It is an immersive, interactive experience for all. Project Type Museums, Arts & Culture Location Denver, Colorado Date Under Construction Design Team Shears Adkins & Rockmore General Contractor Turner Construction Company Project Cost $25.4 Million Steel Contract Value $4.2 Million core/shell; $1.7 Million Tenant Improvement KL&A Scope Main Structural Core/Shell, helical stairs, and substructure framing for art exhibits. Services Provided Structural Engineering; Steel Construction Management; Steel Detailing Materials Steel

  • Tatanka Campground Shower House Septic

    Civil Engineering & Land Surveying Tatanka Campground Shower House Septic 4-unit shower house. Project Type Septic Systems Location Buffalo, Wyoming Date 2018 Team Undisclosed Cost Undisclosed Project Delivery Type Design/Bid/Build Civil Components In series concrete tanks with chamber bed.

  • Flying A Ranch Surface Water Rights

    Civil Engineering & Land Surveying Flying A Ranch Surface Water Rights Amending water rights for change in point of diversion, means of conveyance, and clarification on points of use for surface water rights. Project Type Water Rights Location Buffalo, Wyoming Date 2021 Team Flying A Ranch Cost Undisclosed Project Delivery Type Direct with Owner Civil Components Land Surveying, SEO petition and mapping

  • Odell Sloan's Lake

    Odell Sloan's Lake Tenant finish to an auditorium that will be converted into a 10 BBL brewery, tap room and restaurant with elevator access to a rooftop deck. Project Type Breweries Date 2021 Location Denver, Colorado Architect RB+B Architects Contractor Built Construction Cost $3.4 Million Project Delivery Type Design/Bid/Build Services Provided Structural Engineering Materials

GOLDEN

1717 Washington Ave

Golden, CO 80401

303.384.9910

LOVELAND

421 East 4th St

Loveland, CO 80537

970.667.2426

CARBONDALE

215 N 12th St, Unit E

Carbondale, CO 81623

970.927.5174

BUFFALO

150 S Main St

Buffalo, WY 82834

307.621.7011

OGDEN

2326 Washington Blvd, 4th Floor

Ogden, UT 84401

385.743.3510

  • LinkedIn
  • Instagram
bottom of page