top of page
KL&A Logo.png

Search Results

368 results found with an empty search

  • Dr. Justina Ford Elementary

    Dr. Justina Ford Elementary 93,000 sf school comprised of two levels of steel framing. Project Type Education K-12 Date 2020 Location Centennial, Colorado Architect MOA Architecture Contractor Roche Cost $28 Million Project Delivery Type Design/Bid/Build Services Provided Structural Engineering Materials Composite Steel; Concrete - Mildly Reinforced; Steel; Light Gage - Structural

  • Catalyst

    Catalyst 164,000 sf, 7-story office building with retail space on the ground level; along side 130,000 sf, 5-story parking garage also with retail space on the ground level. Project Type Office & Retail Location Denver, Colorado Date 2018 Design Team The Beck Group; KL&A Structural Engineering General Contractor Beck Building Company Project Cost $33 Million Steel Contract Value $200K KL&A Scope 900 tons structural steel, misc metals and stairs, 5 story office building. Services Provided Structural Engineering; Steel Detailing Materials Composite Steel; Precast Concrete

  • Fidelis - St. Joseph's Outpatient Medical Pavilion

    Fidelis - St. Joseph's Outpatient Medical Pavilion 107,000 sf 4 story medical office building including a 17,000 sf parking garage, and 10,000 sf of retail space. Project Type Healthcare Date 2021 Location Denver, Colorado Architect Boulder Associates Architects Contractor Saunders Construction Cost $40 Million Project Delivery Type Design/Bid/Build Services Provided Structural Engineering Materials Precast Concrete; Steel

  • Jefferson Unitarian Church

    Jefferson Unitarian Church 5,000 sf expansion of existing building containing classrooms and a new children's chapel. Project Type Religious Date 2005 Location Golden, Colorado Architect Barrett Studio Architects Contractor GH Phipps Cost $1.5 Million Project Delivery Type Design/Bid/Build Services Provided Structural Engineering Materials Steel; Structural Masonry

  • KL&A | Civil Projects | Septic Systems

    SEPTIC SYSTEMS Tatanka Campground Shower House Septic 4-unit shower house. Jensen Septic 3-bedroom Residence + RV Hookup. Flying A Ranch Septic 3-bedroom Residence + Single Bedroom in Barn. Cox Septic 5-bedroom Residence.

  • University of Denver Burwell Center for Career Achievement

    University of Denver Burwell Center for Career Achievement 30,000 sf, 4-story building utilizing mass timber panels, glulam beams, and columns on the above grade floors and roof. Project Type Higher Education; Mass Wood Location Denver, Colorado Date Under Construction Design Team Lake Flato; KL&A Structural Engineering General Contractor PCL Construction Project Cost $15 Million Steel Contract Value $170K KL&A Scope Misc steel in 3 story CLT building, steel framed PV array, 2 stairs in CLT cores. Services Provided Structural Engineering; Steel Construction Management; Steel Detailing Materials Cross Laminated Timber; Wood - Heavy Timber; Light Gage - Veneer; Steel

  • Mountain Forge

    Mountain Forge Remodel and addition to the Mountain Forge building including a new pool and spa added to an existing roof. Project Type Mixed Use Location Aspen, Colorado Date Under Construction Design Team Rowland & Broughton General Contractor Madigan & Company Project Cost Undisclosed Steel Contract Value $300K KL&A Scope 40 tons structural steel, misc metals, brick support, planters in renovation to existing residence. Services Provided Steel Construction Management; Steel Detailing Materials Steel; Wood - Stick Frame

  • The Lydian

    The Lydian 215,000 sf apartments over mixed use retail; 5 levels of Infinity framing system over concrete podium slab and below grade parking. Project Type Mixed Use Date 2017 Location Denver, Colorado Architect Craine Architecture Contractor Confluence Builders Cost Undisclosed Project Delivery Type Design/Bid/Build Services Provided Structural Engineering Materials Light Gage - Structural

  • Solitude Plaza and GSB

    Solitude Plaza and GSB 13,700 sf mid mountain dining and retail facility, with 12,000 sf gondola storage facility. Project Type Mixed Use Date 2018 Location Jackson, Wyoming Architect CLB Architects Contractor Zaist Construction Management Cost $7 Million Project Delivery Type Design/Bid/Build Services Provided Structural Engineering Materials Steel; Wood - Stick Frame; Precast Concrete

  • Paco Sanchez Park

    Paco Sanchez Park One building and multiple non-building type structures including a sunshade, pedestrian platform, play equipment, public art pieces, and misc. concrete site elements. Project Type Parks & Recreation Date 2021 Location Denver, Colorado Architect Dig Studio Contractor PCL Construction Cost $2 Million Project Delivery Type Design/Bid/Build Services Provided Structural Engineering Materials Steel; Structural Masonry

  • Ten Sleep K-12 School

    Civil Engineering & Land Surveying Ten Sleep K-12 School Aerial Survey for videography included in design team proposal. Project Type Aerial Survey Location Ten Sleep, Wyoming Date 2022 Team Washakie County School District #2 Cost Undisclosed Project Delivery Type Design/Bid/Build Civil Components Aerial Videography

  • Lagoon Biergarten Phase I & II

    Lagoon Biergarten Phase I & II 7,200 sf building to be used as a bar and restaurant. Followed by additions to the kitchen and keg cooler of Lagoon Biergarten. Project Type Breweries Date 2020 Location Farmington, Utah Architect Dan Stalker Architect Contractor Okland Construction Cost $10 Million Project Delivery Type Design/Bid/Build Services Provided Structural Engineering Materials Wood - Stick Frame

GOLDEN

1717 Washington Ave

Golden, CO 80401

303.384.9910

LOVELAND

421 East 4th St

Loveland, CO 80537

970.667.2426

CARBONDALE

215 N 12th St, Unit E

Carbondale, CO 81623

970.927.5174

BUFFALO

150 S Main St

Buffalo, WY 82834

307.621.7011

OGDEN

2326 Washington Blvd, 4th Floor

Ogden, UT 84401

385.743.3510

  • LinkedIn
  • Instagram
bottom of page