top of page
KL&A Logo.png

Search Results

368 results found with an empty search

  • Kindred Resort

    Kindred Resort 2 condo buildings and one hotel, with 85,500 sf of one level of below grade parking. Project Type Hospitality Date In Design Location Keystone, Colorado Architect OZ Architecture Contractor PCL Construction Cost $145 Million Project Delivery Type Design/Bid/Build Services Provided Structural Engineering Materials Composite Steel; Concrete – Mildly reinforced; Concrete – Post-tensioned; Light Gage – Structural; Steel; Wood – Heavy Timber

  • Calvary Church Addition

    Calvary Church Addition 9,700 sf addition that architecturally and structurally connects the original historic church built in 1867 and the new church built in 1993. Project Type Religious Date 2008 Location Golden, Colorado Architect Architectural Workshop Contractor Himmelman Construction Cost Undisclosed Project Delivery Type Design/Bid/Build Services Provided Structural Engineering Materials Concrete - Post Tensioned; Composite Steel

  • Art Preserve

    Art Preserve 63,000 sf, 3-story art museum. Project Type Museums & Art Centers Date 2018 Location Sheboygan, Wisconsin Architect Tres Birds Workshop Contractor Mortenson Cost $26 Million Project Delivery Type Design/Bid/Build Services Provided Structural Engineering Materials Concrete; Cross Laminated Timber

  • Aims Welcome Center

    Aims Welcome Center 114,000 sf Welcome Center for Aims Community College, featuring 1500 person auditorium, ballroom, office space and numerous complex architectural features. Includes 6’ deep trusses at auditorium and 90’ spans over ballroom. Project Type Higher Education Date 2021 Location Greeley, Colorado Architect Hord Coplan Macht Contractor Fransen Pittman Construction Cost $55 Million Project Delivery Type Design/Bid/Build Services Provided Structural Engineering Materials Steel

  • Douglas Primary School Pavement Improvements

    Civil Engineering & Land Surveying Douglas Primary School Pavement Improvements Pavement replacement and drainage improvements for parking lots and drive aisles within an existing school campus. Project Type Civil Construction Location Douglas, Wyoming Date 2023 Team Converse County School District #1 Cost $632,000 Project Delivery Type Design/Bid/Build Civil Components Grading and drainage design, construction administration.

  • Sova on Grant

    Sova on Grant 288,000 sf 12-story apartment building, with 1 story of below grade parking. Project Type Multi Unit Residential Date 2018 Location Denver, Colorado Architect Craine Architecture Contractor The Weitz Company Cost $40 Million Project Delivery Type Design/Bid/Build Services Provided Structural Engineering Materials Concrete - Post Tensioned; Light Gage - Structural

  • City of Cheyenne Utility Main Extensions

    Civil Engineering & Land Surveying City of Cheyenne Utility Main Extensions 1,400 feet of new 8-inch water main and 1,200 feet of new 8-inch sanitary sewer main. Project Type Civil Construction Location Cheyenne, Wyoming Date 2023 Team City of Cheyenne Cost $670,000 Project Delivery Type Design/Bid/Build Civil Components Water and sewer main design and construction administration

  • Great Platte River Road Archway Monument

    Great Platte River Road Archway Monument 300 foot arch spanning Interstate 80 housing an interpretive center celebrating western migration in the 1800's. Project Type Bridges Date 2000 Location Kearney, Nebraska Architect 4240 Architecture Contractor Kiewit Cost $25 Million Project Delivery Type Design/Bid/Build Services Provided Structural Engineering Materials Composite Steel

  • Front Range Community College Health Care Career Center

    Front Range Community College Health Care Career Center 55,000 gsf educational Health Care Career Center on the Front Range Community College's Larimer Campus. Project Type Higher Education Date 2020 Location Fort Collins, Colorado Architect Hord Coplan Macht Contractor Haselden Construction Cost $21 Million Project Delivery Type Design/Bid/Build Services Provided Structural Engineering Materials Composite Steel

  • Wells Denver Precast

    Wells Denver Precast 28,000 sq ft precast concrete office building and 94,844 sq ft of factory production space consisting of heavy overhead cranes, equipment foundations, precast concrete buildings. Project Type Industrial and Maintenance Location Brighton, Colorado Date Under Construction Design Team Davis Partnership Architects; EOR: KL&A Engineers and Builders General Contractor PCL Construction Project Cost Undisclosed Steel Contract Value $700K KL&A Scope 120 tons structural and misc metals, canopies, site rails, bridge crane support. Services Provided Structural Engineering; Steel Construction Management; Steel Detailing Materials Steel

  • KL&A | Civil Projects | Water Rights

    WATER RIGHTS North Fork Ditch Amending water rights for change in point of diversion and means of conveyance for territorial water rights. Flying A Ranch Bridge Permitting with the Corps of Engineers for construction of new vehicular bridge. Ethel #3 Reservoir Amending water rights for supply and beneficial uses for reservoir.

  • Shadow Array

    This large scale public art piece adorns the new light rail terminal at the south terminal redevelopment of the Denver International Airport. The piece consists of a regular march of cantilevered logs along both embankments of the terminal approach. Progressive changes in cantilever length lends a dynamic interest to the piece as passengers arrive by train. Colorado beatle-kill logs are a primary source of material. Shadow Array This large scale public art piece adorns the new light rail terminal at the south terminal redevelopment of the Denver International Airport. The piece consists of a regular march of cantilevered logs along both embankments of the terminal approach. Progressive changes in cantilever length lends a dynamic interest to the piece as passengers arrive by train. Colorado beatle-kill logs are a primary source of material. Project Type Date Location Artist Fabricator Cost Project Delivery Type Services Provided Materials Sculptures 2016 Denver, Colorado Patrick Marold Patrick Marold Studio $2 Million Design/Bid/Build Structural Engineering Steel; Beetle-Kill Log

GOLDEN

1717 Washington Ave

Golden, CO 80401

303.384.9910

LOVELAND

421 East 4th St

Loveland, CO 80537

970.667.2426

CARBONDALE

215 N 12th St, Unit E

Carbondale, CO 81623

970.927.5174

BUFFALO

150 S Main St

Buffalo, WY 82834

307.621.7011

OGDEN

2326 Washington Blvd, 4th Floor

Ogden, UT 84401

385.743.3510

  • LinkedIn
  • Instagram
bottom of page