top of page
KL&A Logo.png

Metro State Student Success Center

145,000 sf 4 story steel framed building featuring a 44 ft cantilever framed with 2 story steel vierendeel trusses. LEED Gold BD+C.

Project Type

Higher Education

Location

Denver, Colorado

Date

2012

Design Team

RNL Design/Stantec Architecture, Inc.; KL&A Structural Engineering

General Contractor

Saunders Construction

Project Cost

$62 Million

Steel Contract Value

$125K

KL&A Scope

750 tons structural steel, 4 story office and classroom building.

Services Provided

Structural Engineering; Steel Detailing

Materials

Steel

GOLDEN

1717 Washington Ave

Golden, CO 80401

303.384.9910

LOVELAND

421 East 4th St

Loveland, CO 80537

970.667.2426

CARBONDALE

215 N 12th St, Unit E

Carbondale, CO 81623

970.927.5174

BUFFALO

150 S Main St

Buffalo, WY 82834

307.621.7011

OGDEN

2326 Washington Blvd, 4th Floor

Ogden, UT 84401

385.743.3510

  • LinkedIn
  • Instagram
bottom of page