top of page
KL&A Logo.png

St. Joseph's Hospital & Health Center

3 Buildings, Hospital is 74,000 sf, 1 story: MOB is 17,000 sf with the lower level being an outpatient surgery center: CUP is 10,000 sf utility building.

Project Type

Healthcare

Date

2014

Location

Dickinson, North Dakota

Architect

Davis Partnership Architects

Contractor

JE Dunn Construction

Cost

$72.9 Million

Project Delivery Type

Design Build

Services Provided

Structural Engineering

Materials

Steel

GOLDEN

1717 Washington Ave

Golden, CO 80401

303.384.9910

LOVELAND

421 East 4th St

Loveland, CO 80537

970.667.2426

CARBONDALE

215 N 12th St, Unit E

Carbondale, CO 81623

970.927.5174

BUFFALO

150 S Main St

Buffalo, WY 82834

307.621.7011

OGDEN

2326 Washington Blvd, 4th Floor

Ogden, UT 84401

385.743.3510

  • LinkedIn
  • Instagram
bottom of page