top of page
KL&A Logo.png

Colorado State University Aggie Village

443,000 sf in multiple buildings consisting of residential halls, classrooms, and basement parking levels.

Project Type

Campus Housing

Date

2015

Location

Fort Collins, Colorado

Architect

4240 Architecture

Contractor

PCL Construction

Cost

$60 Million

Project Delivery Type

Design/Bid/Build

Services Provided

Structural Engineering

Materials

Wood - Stick Frame; Precast Concrete

GOLDEN

1717 Washington Ave

Golden, CO 80401

303.384.9910

LOVELAND

421 East 4th St

Loveland, CO 80537

970.667.2426

CARBONDALE

215 N 12th St, Unit E

Carbondale, CO 81623

970.927.5174

BUFFALO

150 S Main St

Buffalo, WY 82834

307.621.7011

OGDEN

2326 Washington Blvd, 4th Floor

Ogden, UT 84401

385.743.3510

  • LinkedIn
  • Instagram
bottom of page