
CONVERGENCE STATION
KL&A played a uniquely integrated role in Meow Wolf Denver’s Convergence Station, serving as structural engineer, steel construction manager, and steel detailer. The 90,000 square foot building was constructed on a tight triangular site between elevated highways, demanding innovative structural solutions and close coordination from the outset. KL&A designed the core and shell, including drilled-pier foundations, lateral braced frames, and composite steel floors engineered to support the high loads required for immersive exhibits and future adaptability.
Date: 2021
Location: Denver, Colorado
Architect: SAR+ Architects
Contractor: Turner Construction Company
Project Type: Commercial
Square Footage: 95,000 sf
Construction Cost: $25.4 Million
Services Provided:
Structural Engineering
Steel Construction Management
Steel Detailing
MEOW WOLF


Beyond design, KL&A managed steel detailing, fabrication coordination, and erection logistics. Their team produced all shop drawings and worked closely with the fabricator and erector to ensure efficient delivery and installation. Many art elements were integrated into the structural frame, requiring close collaboration with Meow Wolf’s creative team to support the architectural vision while maintaining structural integrity.


RECOGNITION
2023 ACEC Engineering Excellence Awards - National Recognition Award
2022 ACEC Colorado Engineering Excellence Awards - Excellence
2022 AIA Colorado Design Award
ENR Mountain States 2022 Best Projects
2022 AGC ACE Awards, Best Building Project - General Contractor Bronze Award
2021 Mayor's Design Award
2021 NAIOP Innovative Development of the Year
The result is a highly adaptable structure that supports the building’s immersive experiences while accommodating future needs. KL&A’s involvement throughout the project lifecycle allowed for seamless coordination between design, detailing, and construction, contributing to the successful delivery of one of Denver’s most ambitious and unconventional cultural destinations.
