top of page
KL&A Logo.png

CITY CAMPUS

The Boulder Western City Campus transforms a former industrial site into a high-performance civic workplace that brings multiple City of Boulder departments together in a flexible, collaborative environment. Designed with a strong focus on sustainability and long-term adaptability, the campus supports both operational needs and public engagement while targeting ambitious carbon reduction goals.

Date: In Design

Location: Boulder, Colorado

Architect: ZGF Architects

Contractor: Saunders Construction

Project Type: Civic

Square Footage: 60,000

Construction Cost: Undisclosed

Services Provided:

  • Construction Management

  • Steel Detailing

  • Embodied Carbon Consulting

BOULDER WESTERN

KL&A provided construction management, steel detailing, and embodied carbon consulting, helping connect design, fabrication, and field execution. By aligning detailing with sequencing and working closely with the project team, KL&A streamlined coordination and supported efficient delivery across the campus .

Through early evaluation of structural systems and materials, KL&A also helped reduce embodied carbon while maintaining performance and constructability. The result is a forward-thinking civic campus that reflects Boulder’s environmental leadership and the value of an integrated project approach.

BUFFALO

150 S Main St

Buffalo, WY 82834

307.621.7011

​

CARBONDALE

215 N 12th St, Unit E

Carbondale, CO 81623

970.927.5174

GOLDEN

1717 Washington Ave

Golden, CO 80401

303.384.9910

​​

LAKEWOOD

205 S Garrison St

Lakewood, CO 80226

303.498.9831

LOVELAND

421 East 4th St

Loveland, CO 80537

970.667.2426

​

OGDEN

2326 Washington Blvd, 4th Floor

Ogden, UT 84401

385.743.3510

  • LinkedIn
  • Instagram
bottom of page