top of page
3060 Brighton Blvd/VF Labs
6,000 sf steel-framed mezzanine structure with two steel-framed stairs connecting the mezzanine space to level 1.
Project Type
Mixed Use
Location
Denver, Colorado
Date
2020
Design Team
OZ Architecture
General Contractor
BuildMark
Project Cost
Undisclosed
Steel Contract Value
$800K
KL&A Scope
70 tons structural steel mezzanine inside existing building, architectural misc metals, stairs, rails.
Services Provided
Steel Construction Management; Steel Detailing
Materials
Steel
bottom of page