University of Denver Burwell Center for Career Achievement Center

30,000 sf, 4-story building utilizing mass timber panels, glulam beams, and columns on the above grade floors and roof.   

Project Type

Higher Education; Mass Timber

Date

Under Construction

Location

Denver, Colorado

Architect

Lake Flato

Contractor

PCL Construction

Cost

$15 Million

Project Delivery Type

Design/Bid/Build

Services Provided

Structural Engineering

Materials

Cross Laminated Timber; Steel; Wood - Heavy Timber; Light Gage - Veneer

GOLDEN

1717 Washington Ave

Golden, CO 80401

303.384.9910

LOVELAND

421 East 4th St

Loveland, CO 80537

970.667.2426

CARBONDALE

215 N 12th St, Unit E

Carbondale, CO 81623

970.927.5174

BUFFALO

150 S Main St

Buffalo, WY 82834

307.621.7011

  • LinkedIn
KL&A Logo.png