A fast-track project, Building 29C was completed in 9 months after the design process began. Coordination with the equipment manufacturer in Switzerland was critical during the design phase.
This 15,000 sf city-owned facility is a LEED certified project.
The project is two 4-story pop-up structures and associated equipment platforms within an existing building that will be used for advanced material processing
625,000 sf of manufacturing space in five buildings with heavy overhead crane systems, numerous below grade structures and heavy design loads