Shaw Construction


Bucksbaum Campus

 

105,000 sf redevelopment of the 22-acre Castle Creek Campus.  The campus is used by the Aspen Music Festival and School in the summer and the Aspen County Day School in the winter.  The multi-phased, fast track project includes new construction of two new bridges, practice rooms, teaching studios, three rehearsal spaces, classrooms, science lab and gymnasium and upgrades to an existing bridge.

 

20/20

 

353,000 sf post-tensioned concrete apartment complex with 7 stories of residential over 3 stories of parking. LEED Gold BD+C.

 

Benedict Music Tent

 

37,500 sf Legacy facility, creating a permanent venue for the Aspen Music Festival, containing the main tent canopy, a stage canopy, back of house & an underground link to the Harris Concert Hall.

 

Kirkland Museum

 

40,000 sf museum

 

Polo Club Residence

 

10,000 sf new two story residence and 1,400 sf single story guest house featuring large eaves and massive stone clad walls supported by drilled piers to accommodate the site conditions. 

 

Modera River North (28th and Blake)

 

251,389 sf 4-story apartment building with one level of below parking

 

Bucksbaum Campus Phase II

 

The final phase of the campus renovation including the remodel of the existing 9,500 sf of historic Administration Building and the addition of a 14,500 sf Cafeteria Building, and 11,000 sf Middle School Building, and 8,250 sf Gym/Rehearsal Hall.

 

810 West Snow King

 

36-unit wood framed town home project of which 20 units are affordable.

 

Doerr-Hosier Center

 

The Doerr-Hosier Center, the new conference center at The Aspen Institute, earned a LEED Green Building Gold Rating.  The 22,000 sf building was constructed using low-impact materials, making the most of natural lighting and devising a geothermal reflecting pool to heat and cool the building.  

 

DHA Phase IV

 

105,000 sf, cast in place or post-tensioned concrete apartment complex with 2 and 3 stories of wood framing over concrete framed parking and commercial levels, anticipated LEED TBD. 93 units.

 

28th & Blake - Modera

 

4 stories of wood framing atop cast in place post-tensioned podium slab, at grade cast in place mild-reinforced structural slab and 1 story below grade parking.

 